LebanonGeitawi District Digital Documentation
Selected buildings and urban areas in Geitawi were laser scanned and converted into coordinated existing-condition BIM models.
SERVICE / 06
XYZ turns point clouds and verified survey information into existing-condition BIM models for design, renovation and project coordination. Our Lebanon-based team supports local assignments and remote production for international scanning, architecture and engineering teams. Before production, we agree the disciplines, elements, information requirements, geometric tolerances and deliverables.
Discuss Your BIM RequirementsTypical client needs
XYZ approach
Define the scope: review model uses, source data, disciplines, information requirements and programme.
Prepare the information: check point-cloud structure, alignment and coordinate requirements.
Build the agreed model: organize selected elements using the project conventions.
Review against the source: compare the model with captured information and record limitations.
Issue the deliverables: provide the agreed package, scope, conventions and necessary qualifications.
Workflow
Possible deliverables
Format and availability depend on project requirements, source-data quality, coordinate system, software environment, intended use, and update process.
XYZ can join your workflow after field capture. Describe the dataset, required software environment and expected outputs so we can review the production scope and timing. Confirm software versions, exchange formats, coordinates, naming and issue requirements before production.
For dataset preparation, explore point-cloud registration and processing. For ongoing support, see our remote production partnership.
QUALITY + VERIFICATION
Agree geometric tolerances separately from the level of development. Concealed, inaccessible or insufficiently captured conditions are limitations, not measured facts. A visual model is not automatically a complete construction or fabrication model; each issue should state what it represents and excludes.
Applicable industries
Related verified work
Related services
Questions
Yes. Remote production can begin from client-supplied data, subject to a review of its suitability and the agreed model requirements.
It is defined for the assignment. State the required modeled elements and information, and agree geometric tolerances separately instead of relying on a label alone.
The available record depends on access and what was captured. Concealed or inaccessible conditions should not be presented as measured facts without supporting evidence.
XYZ needs to review the dataset, project extent, complexity, modeled disciplines, required detail and issue requirements before confirming a quotation and programme.
Send the project location, approximate extent, source-data description, required model uses, deliverables and target dates. Arrange large-data transfer separately; the initial enquiry form is for the brief, not the full dataset.
XYZ · PROJECT INTAKE
Share the site, available data, required outputs, intended users, and constraints. XYZ will help define the right workflow.
Discuss the Project